| Temperature band (chiller vs freezer) | Freezer rooms (-18°C to -22°C) commonly specify higher-insulation panel cores or thickness (typically 100–150mm depending on core material), heated door frames, pressure relief valves, insulated floors, and defrost drainage compared with standard 0–4°C chillers. | Target holding temperature, daily stock load, and whether product enters hot or pre-chilled |
| Insulated panel core and thickness | PIR fire-rated panels cost more than standard EPS panels, and thicker walls (100–150mm) add material and transport cost. | Internal dimensions (L × W × H), required panel core type, and any shopping-centre or insurer fire rating |
| Refrigeration plant and ambient rating | High-ambient condensers for Brisbane, Perth, or Darwin summers and remote roof-mounted units cost more than compact drop-in monoblocks. | Preferred condenser location (indoor plant room, outdoor wall, or roof) and pipe-run distance |
| Flooring, drainage, and doors | Heavy-duty treadplate or insulated floors, wide trolley doors, strip curtains, and heated condensate drains add fabrication time. | Existing slab condition, trolley or pallet weight, door swing clearance, and floor-waste point |
| Site access and installation hours | Tight CBD laneways, upstairs tenancies, crane lifts, or after-hours centre-management work increase labour charges. | Site photos, lift/stair dimensions, loading-dock limits, and permitted trade hours |
| Excluded trades and compliance | Electrical sub-boards, plumbing waste lines, shelving, and building approvals often sit outside a cool room builder quote. | Confirm in writing whether electrical, plumbing, shelving, and commissioning are included or excluded |