Buyer guide

Commercial Kitchen Fitout Cost Planning In Australia

A planning guide for deciding what cost questions to ask suppliers before you compare quotes.

Restaurant Fitout CompaniesCommercial Kitchen Designers

Five scopes to separate in a commercial kitchen fitout quote

Give each supplier the same drawings and equipment schedule so you can compare who supplies, installs, and commissions each part of the kitchen.

Quote scopeWhat affects costWhat to ask the supplier to price
Design and approvalsMeasured drawings, service coordination, and the number of submissions and revisions.Itemise design drawings, equipment schedules, submission fees, and responses to council or certifier requests.
Construction and tradesStrip-out, floor and wall finishes, service capacity, and access for trade deliveries.Break out demolition, plumbing, grease waste, gas, electrical work, joinery, and making good.
Exhaust canopy and make-up airCooking duty, canopy size, duct length, roof access, and a source of replacement air.Price canopy, ducting, fan, make-up air, roof works, and airflow commissioning.
Commercial cooking and dish equipmentMenu throughput, appliance capacity, and power, water, and waste connections.List model numbers, delivery and placement, connections, commissioning, and warranty responsibility.
Refrigeration and cool roomsStorage volume, chilled or frozen operation, insulation, and condenser placement.Price the insulated room, plant, shelving, electrical feed, condensate drainage, and handover testing.

What drives commercial kitchen fitout costs in Australia?

The five main commercial kitchen fitout costs in Australia are design and approvals, construction trades, ventilation, cooking and dish equipment, and refrigeration.

Ask each supplier for a subtotal for each scope with GST, freight, installation, and commissioning identified. Itemised quotes show which supplier carries each cost and which trades you need to price separately.

How does a bare shell compare with a second-generation tenancy?

A bare shell typically needs new service connections, kitchen finishes, and a complete ventilation system. A second-generation tenancy can save on construction when the existing services have enough capacity for the new menu and equipment.

Share the landlord’s handover specification or an inventory of inherited equipment and services. Ask the builder to price retain, repair, and replace options for the exhaust, grease waste, electrical supply, and cool room before agreeing on the construction budget.

Which approvals and food-premises items belong in the quote checklist?

The quote should name who will prepare the food-premises layout, coordinate building and mechanical requirements, and handle each submission or inspection.

  • Use FSANZ Standard 3.2.3 to brief cleanable finishes, hand-washing facilities, ventilation, and water and waste connections.
  • Ask the designer or certifier to identify the applicable NCC provisions and include the drawings, trade coordination, and inspection milestones in the quote.
  • Use ABLIS for the business activity and local government area, then list the relevant licences and permits, their fees, and who prepares each application.

How do you compare provisional sums and exclusions?

Compare each provisional sum using the same quantity, unit rate, allowance, and trigger for a price change.

Ask for a priced allowance for concealed services, switchboard capacity, grease-trap connections, roof penetrations, and after-hours access where the site has unresolved details. Confirm who supplies client-selected appliances, who connects them, and how the builder prices variations before work begins.

Planning references

Official sources to check

Use these references to prepare questions for suppliers, councils, certifiers, or advisers.

Commercial Kitchen Fitout Cost Planning In Australia checklist context

Food Standards Australia New Zealand

Safe Food Australia: Standard 3.2.3 Food Premises and Equipment

Use this when your project changes food-premises layout, equipment, cleanability, water, waste, storage, or contamination-control assumptions.

Question to ask

Ask suppliers how their drawings and scope help you prepare for food-premises review with the relevant local authority.

Open official source
Commercial Kitchen Fitout Cost Planning In Australia checklist context

business.gov.au

Register licences and permits

Use this as the starting point for identifying licences and permits before you rely on a supplier quote.

Question to ask

Check which licences, permits, and local government steps apply to your business type and location.

Open official source
Commercial Kitchen Fitout Cost Planning In Australia checklist context

Australian Business Licence and Information Service

Find the licences you need for your business

Use ABLIS to find licence, permit, and approval requirements that vary by business and location.

Question to ask

Run a project-specific licence search before treating any generic checklist as complete.

Open official source
Commercial Kitchen Fitout Cost Planning In Australia checklist context

Australian Building Codes Board

NCC 2025: VIC Part E2 Heating, ventilation and air conditioning systems

Use this as an NCC signpost for mechanical ventilation, air-conditioning, pressure equipment, microbial control, and related plumbing/HVAC questions.

Question to ask

Ask hood, exhaust, refrigeration, and mechanical-services suppliers which NCC parts and standards apply to your site, state, and building class.

Open official source