Buyer guide

How To Brief Hood And Exhaust Suppliers

Use this page to prepare better conversations about ventilation, ducting, and kitchen exhaust scope.

Hood And Exhaust Specialists

Five scopes to compare in a restaurant exhaust quote

Give suppliers the cooking equipment schedule, site drawings, and access details so they can price the same extraction and make-up air scope.

Quote scopeWhat affects the designWhat to include in your brief
Canopy capture and filtersAppliance dimensions, cooking load, and hood mounting height influence capture.Provide the cooking-line plan, appliance types, ceiling height, and existing canopy and filter details.
Ducting route and fire ratingRoute length, bends, shared shafts, and penetrations affect installation and access.Mark the discharge point, route, floor or wall penetrations, and landlord access requirements.
Make-up air balanceThe source and distribution of replacement air affect hood capture and the air movement between rooms.Share supply-air drawings, air-conditioning details, and adjoining public and preparation areas.
Exhaust fan and motor replacementFan duty, motor rating, controls, and installation access affect replacement scope.Supply the fan model, motor nameplate, speed controller details, and roof or inline access photos.
Commissioning and cleaning accessTest points, access panels, and the trading schedule affect handover and future servicing.Specify airflow readings at handover, filter and duct access, cleaning records, and service windows.

When do you need a new canopy or a replacement exhaust fan motor?

A new cooking line needs a canopy and ventilation design matched to the appliances and cooking duty. An existing system with a failed fan or motor can suit a targeted replacement once the specialist confirms the canopy, ducting, and airflow are suitable for the current cooking line.

For a new system, give the installer an appliance schedule and show whether the cooking line is against a wall or on an island so they can price the canopy and filter layout. For repair or replacement, share the symptoms, fan model, motor nameplate, and available service hours.

How do roof routes and multi-tenant buildings affect exhaust design?

Roof discharge depends on an agreed duct route, access for installation and cleaning, and a discharge point coordinated with neighbouring tenancies and air intakes.

Share tenancy plans showing the ceiling void, shared shafts, roof penetrations, intake locations, and nearby windows. Ask the mechanical designer to map the route and the landlord or centre manager to confirm access, work hours, and responsibility for roof works.

How do the NCC, Australian Standards, and local approvals fit together?

The mechanical designer and building certifier identify the applicable NCC provisions and referenced standards for your building and jurisdiction, while the council handles the relevant local planning and food-business approvals.

Ask the designer which editions of AS 1668.1 for fire and smoke control and AS 1668.2 for mechanical ventilation apply to the project. Use ABLIS to identify local approval steps and ask the council which drawings and installation records it needs for the proposed use.

What should an exhaust quote include for commissioning and grease cleaning?

An exhaust quote should state the airflow readings to be recorded at commissioning, where technicians can reach filters and ducts, and who supplies the cleaning and maintenance schedule.

Include the appliance list, canopy dimensions, ceiling height, duct size and route, make-up air supply, fan model, and motor kW, RPM, and phase where available. Supply the most recent cleaning record and roof-access hours so suppliers can price grease removal and service visits.

Planning references

Official sources to check

Use these references to prepare questions for suppliers, councils, certifiers, or advisers.

How To Brief Hood And Exhaust Suppliers checklist context

Food Standards Australia New Zealand

Safe Food Australia: Standard 3.2.3 Food Premises and Equipment

Use this when your project changes food-premises layout, equipment, cleanability, water, waste, storage, or contamination-control assumptions.

Question to ask

Ask suppliers how their drawings and scope help you prepare for food-premises review with the relevant local authority.

Open official source
How To Brief Hood And Exhaust Suppliers checklist context

Australian Building Codes Board

NCC 2025: VIC Part E2 Heating, ventilation and air conditioning systems

Use this as an NCC signpost for mechanical ventilation, air-conditioning, pressure equipment, microbial control, and related plumbing/HVAC questions.

Question to ask

Ask hood, exhaust, refrigeration, and mechanical-services suppliers which NCC parts and standards apply to your site, state, and building class.

Open official source
How To Brief Hood And Exhaust Suppliers checklist context

Australian Business Licence and Information Service

Find the licences you need for your business

Use ABLIS to find licence, permit, and approval requirements that vary by business and location.

Question to ask

Run a project-specific licence search before treating any generic checklist as complete.

Open official source