Buyer guide

Second-Generation Restaurant Fitout Checklist

A guide for operators taking over an existing hospitality site and deciding what can stay, what must change, and who to call first.

Restaurant Fitout CompaniesHood And Exhaust SpecialistsCool Room And Refrigeration Specialists

Five inherited kitchen systems to audit before signing a hospitality lease

Second-generation venues save budget only when existing exhaust, grease waste, refrigeration, and utility capacities match your new menu and trading hours.

Inherited systemWhat to inspect on siteSpecialist to bring in early
Exhaust canopy & ductingCanopy dimensions, filter condition, fan motor health, discharge route, and recent cleaning certificates.Commercial rangehood and kitchen exhaust installer
Grease trap & plumbingGrease-arrestor capacity, trade-waste approval status, floor-waste falls, and hot-water recovery rate.Restaurant fitout company or commercial hydraulic plumber
Cool room & refrigerationPanel seal integrity, floor condition, condenser age, holding temperature stability, and condensate drains.Commercial refrigeration or cool room specialist
Electrical & gas supplyThree-phase switchboard spare capacity, gas meter load in MJ/hr, and appliance isolation points.Commercial kitchen designer or licensed fitout contractor
Finishes & lease make-goodCoved flooring, washable wall linings, hand-wash basins, and landlord handover or make-good clauses.Restaurant fitout company and building certifier

What should you audit first in a second-generation restaurant kitchen?

Audit the highest-cost fixed infrastructure first—exhaust canopy and ducting, grease-trap capacity, walk-in cool room plant, and electrical or gas supply—because replacing any one of these systems can erase the savings of taking over an existing kitchen.

Walk the tenancy with your planned menu and appliance list in hand. Document what stays, what needs servicing, and what must be replaced before committing to construction timelines or rent-free periods.

  • Verify canopy capture width and fan airflow against your heaviest cooking appliances
  • Inspect existing cool room seals, compressor condition, and thermostat performance under load
  • Confirm total electrical amps and gas meter capacity before adding combi ovens, fryers, or deck ovens

When does retaining existing exhaust or cold storage make sense?

Retain an inherited exhaust system or cool room when its physical layout, capacity, and documented condition match your new cooking load and holding temperatures without major structural rework.

Where a menu shifts from low-grease cafe prep to heavy chargrilling or wok cooking—or from chilled storage to sub-zero freezer duty—price both targeted upgrades and full replacement side by side.

  • Request a written airflow and fan inspection on existing canopies before building finishes around them
  • Confirm whether inherited cool room panels, floor insulation, doors, and plant are rated for your target temperature band
  • Ask fitout builders to price retain, repair, and replace options as separate line items

How do FSANZ 3.2.3, NCC rules, and local food-business notifications apply to a site takeover?

Taking over an existing hospitality premises still requires notifying or registering the ownership change with the relevant food authority—your local council in most states, or the state or territory health authority in jurisdictions such as the ACT—and layout, ventilation, or use changes can trigger updated NCC and building-certifier sign-offs.

Use FSANZ Standard 3.2.3 to review food-contact surfaces, coved floors, hand-washing sinks, and waste areas; search the venue activity and location in ABLIS to identify which notifications, registrations, licences, or permits apply; and confirm applicable NCC mechanical ventilation and building rules with your designer or certifier.

Who should you call first and what belongs in your takeover brief?

Match your first supplier shortlist to the largest technical unknown on site, then send every shortlisted contractor the same one-page takeover brief and site photos.

  • Layout or menu-change bottleneck: start with a commercial kitchen designer or turnkey fitout company
  • Ventilation, odour, or motor-fault bottleneck: call a commercial rangehood and exhaust specialist first
  • Cold-storage or cabinet reliability bottleneck: book a commercial refrigeration or cool room specialist
  • Include tenancy floorplan, landlord handover inventory, target menu equipment list, and desired opening date

Planning references

Official sources to check

Use these references to prepare questions for suppliers, councils, certifiers, or advisers.

Second-Generation Restaurant Fitout Checklist checklist context

Food Standards Australia New Zealand

Safe Food Australia: Standard 3.2.3 Food Premises and Equipment

Use this when your project changes food-premises layout, equipment, cleanability, water, waste, storage, or contamination-control assumptions.

Question to ask

Ask suppliers how their drawings and scope help you prepare for food-premises review with the relevant local authority.

Open official source
Second-Generation Restaurant Fitout Checklist checklist context

business.gov.au

Register licences and permits

Use this as the starting point for identifying licences and permits before you rely on a supplier quote.

Question to ask

Check which licences, permits, and local government steps apply to your business type and location.

Open official source
Second-Generation Restaurant Fitout Checklist checklist context

Australian Business Licence and Information Service

Find the licences you need for your business

Use ABLIS to find licence, permit, and approval requirements that vary by business and location.

Question to ask

Run a project-specific licence search before treating any generic checklist as complete.

Open official source
Second-Generation Restaurant Fitout Checklist checklist context

Australian Building Codes Board

NCC 2025: VIC Part E2 Heating, ventilation and air conditioning systems

Use this as an NCC signpost for mechanical ventilation, air-conditioning, pressure equipment, microbial control, and related plumbing/HVAC questions.

Question to ask

Ask hood, exhaust, refrigeration, and mechanical-services suppliers which NCC parts and standards apply to your site, state, and building class.

Open official source